<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>IAAC Blog &#187; catalan technique</title>
	<atom:link href="http://legacy.iaacblog.com/blog/tag/catalan-technique/feed/" rel="self" type="application/rss+xml" />
	<link>http://legacy.iaacblog.com</link>
	<description>Everyday life at the Institute for advanced architecture of Catalonia</description>
	<lastBuildDate>Wed, 07 Oct 2015 10:24:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	
		<item>
		<title>PRACTISE FABRICATION // BRICK WORKS THIN-TILE VAULT // day 6 &amp; 7</title>
		<link>http://legacy.iaacblog.com/blog/2014/practise-fabrication-brick-works-thin-tile-vault-day-6-7/</link>
		<comments>http://legacy.iaacblog.com/blog/2014/practise-fabrication-brick-works-thin-tile-vault-day-6-7/#comments</comments>
		<pubDate>Wed, 21 May 2014 20:35:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[IaaC Life]]></category>
		<category><![CDATA[Uncategorized]]></category>
		<category><![CDATA[catalan technique]]></category>
		<category><![CDATA[pavilion]]></category>
		<category><![CDATA[practise fabrication]]></category>
		<category><![CDATA[structure]]></category>
		<category><![CDATA[students]]></category>

		<guid isPermaLink="false">http://legacy.iaacblog.com/?p=11982</guid>
		<description><![CDATA[On the last scheduled day on the site, a big effort was made to finish the first layer of bricks, in order for the pavilion to obtain structural integrity and the steel rods to be removed. The weather slowed things down, as varying humidity conditions affected with the behaviour of the fast-setting concrete mixture, while [...]]]></description>
	    
    <div class="home-slide">
    <div class="controls" style="display: none;">
    <a href="#" class="prev"></a>
    <a href="#" class="next"></a>
    </div>
    <div class="slide-content">
        </div><!-- /slide-content -->
    </div><!-- /home-slide -->
    			<content:encoded><![CDATA[
<p>On the last scheduled day on the site, a big effort was made to finish the first layer of bricks, in order for the pavilion to obtain structural integrity and the steel rods to be removed. The weather slowed things down, as varying humidity conditions affected with the behaviour of the fast-setting concrete mixture, while at times rain made it impossible to work on the site. Students and stuff put a lot of effort, while becoming acquainted with this unique catalan technique. Once more, the day ended with a big barbeque. The pavilion is not yet complete, which means more visits will be paid to the site until the completion of the structure.</p>
<p><span id="more-11982"></span></p>
<p><a href="http://legacy.iaacblog.com/wp-content/uploads/2014/05/@DSC01171.jpg"><img class="aligncenter size-large wp-image-11984" alt="SONY DSC" src="http://legacy.iaacblog.com/wp-content/uploads/2014/05/@DSC01171-730x488.jpg" width="730" height="488" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://legacy.iaacblog.com/blog/2014/practise-fabrication-brick-works-thin-tile-vault-day-6-7/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
