Monthly Archives: May 2012

TERM III midjury 1

Building on the performative structure of Term II, we want to explore how a temporary reactive structure can add to the quality of life for inhabitants of Torre Baro. The proposal is a pre-fabricated, low impact structre that inhabits temporarily available plots and generates a shared space that locals can rearrange as they wish seasonally. [...]

Posted in Alessandra Antonetti, DS2 Selfsufficient buildings, Liv Grete Framgard, Phase 3, Students | Comments closed

PuriFacility

Our building is located on the hills of Torre Baro, an area established by immigrants who were coming to work in the city. This area grew up without any plan whatsoever. Torre Baro and the areas around it have been neglected by authorites and do not have the same quality facilites as the ones in [...]

Posted in Uncategorized | Comments closed

FLORAlab

A comunity space for Torre Baro, Barcelona.

Posted in DS2 Selfsufficient buildings, Esteban Sepulveda, Phase 3, Rodrigo Gabriel Aguirre Pereira | Leave a comment

Morphing spaces

01
Posted in DS2 Selfsufficient buildings, Golrokh Shahbaz, GONZALO MANUEL GARRIGA, Gyorgy Bukosdi, Phase 3 | Comments closed

WATER HARVESTING BUILDING :::

The idea mainly targets the future problem of water scarcity.  The attempt is to harvest water from humidity, thus, activities occurring on site need to play a role in heating up the air. Water vapor then condenses by hitting cold bodies (Building elements) on site. By so, we create a cycle of water reuse out [...]

Posted in DS2 Selfsufficient buildings, HUNIA TOMOUM, Phase 3 | Comments closed