Mid Term Presentation


Mid Term Presentation model.
-Structural concept
- Circulations
- Program relations

Posted in Uncategorized | Leave a comment

Multidisciplinar Optimization_ Mehran Haghbin

Posted in Uncategorized | Leave a comment

Controlled City Arian Hakimi Nejad, Diana Nitreanu, Andrea Debilio


Posted in Uncategorized | Leave a comment

Wind Turbine interactivity controled with Iphone Application

Team : Andrea Debilio, Diana Nitreanu, Arian Hakimi

Posted in Uncategorized | Leave a comment

Impure Final Assignment

Float of democracy in comparison with population and life expectancy

We had to modify our spreadsheet.We remap the values to a different domain ;,and to have a faster workspace during the experiments , we took a potion of it.
Connecting the values to the “worldmap” visualizer , with a number scroller ,we got a map of democracy values for each year . And using “simple ComparativeProportion” and “ComparativeProportionTriple” ,we mange to have a visualization showing the ratio between democracy,population and life expectancy.

Now our main issue is to create a visualization , showing the float of democracy in all of the countries ,during the past century in a singe graph.

Antonio Atripaldi
Mani Khosrovani

Posted in Uncategorized | Leave a comment

Barcelona 0 Emissions, Sants

DESIGN STUDIO I – ANDREA DEBILIO
My proposal consists in a visionary project born to improve the existing layout of the neighborhood through a self-sufficient grid over the existing one.
After having analyzed the public spaces and their connections within the neighborhood through the study of density in relation to a 10-minute walk from each point, I have created a new shape developed along a path that would combine the hot spots (camp nou, Sants Station, a big commercial center and the two ramblas) maximising the use of
the space around the nodes.
The new highline integrates technologies able to recycle waste and stormwater and create new green areas.
Each hole of the structure has been identified combining parametric design software and an Ecotect solar access analysis: their functions
(water, green, solar panels, Texlon pneumatic cushions) are the result.
Through the extensive use of the latest energy saving techniques and new metamaterials it can produce energy and share it with the buildings around.

FULL PRESENTATION HERE:

Design Studio I Andrea Debilio Full Presentation

Posted in Uncategorized | Tagged , , , , , , , , , , | Leave a comment

Social Network Between Trees & Buildings – Final?

Posted in Uncategorized | Leave a comment

The AfterMap Proposal:: BAIX GUINARDO-CAN BARO-EL GUINARDO- EL CARMEL

Publication here:
The AfterMap: More Greenery + Green Production + Water ReUse

PDF here:
The AfterMap: More Greenery + Green Production + Water ReUse

Posted in Uncategorized | Leave a comment

Plantoid – Netwowk – BCN

Pdf presentation here:

Animation here:

Archpoint Agents BCN from Morten Bülow on Vimeo.

Posted in Uncategorized | Leave a comment

Exploring the Potential to Harness Water to Generate Energy

Team: Daniela Quesada, Luz Michelle Lavayen and Yashaswini Apte.

Building scale . Putxet blocks

We propose to generate Hydroelectric power using the ‘Pico-hydroelectric system’ for the buildings in Putxet. Electricity will be generated by individual buildings using the rain water collected on the terraces.

This system shall be installed in buildings having a water head > 20m. Water turbines alongwith generators shall be located at the bottom of the terrace rain water downtake pipes. The energy generated by the water _owing over the turbine is converted into electrical energy that drives the generator. Electricity is generated using the speed of water _owing from a height.

For buildings having water head < 20m, the rain water collected on the terrace shall be diverted to an underground reservoir within the block. From here it will be pumpedup to the overhead reservoirs on the buildings with higher water head. Depending on the size of the block, availability of space and quantity of water collected one or several underground reservoirs are proposed within a block. Incase adequate storage cannot be provided within a block, the excess water can be diverted to a reservoirs in other blocks or connected to the rainwater collection along the roads of the barrio. The rain water reservoirs ensures that the system can operate even during periods of low or no rainfall.

Barrio scale . Putxet

City scale .  Barcelona

The main idea of the proposal is to take advantage of the water collection through the drainage system and planning a water pumping system to generate electricity in the peak demand hours. For less impact, we are using the existing system and taking advantage of the deposits of rain water located around Barcelona.

1. Recognizing the existing water network in Barcelona.

2. Recognizing the potential sites according to topography where we can apply the model of our barrio Putxet in all Barcelona.

3. Connecting the existing water deposits with the pumping loops according to topography and using the main existing network.

Posted in Uncategorized | Leave a comment