PRACTISE FABRICATION // BRICK WORKS THIN-TILE VAULT // day 2

Day 2 of the Brick Works Thin-Tile Vault Seminar was and intense and productive day at the Valldaura Self-Sufficient Labs.

The day started out with recycling wood for the formwork necessary to accomplish the structure, that was later assembled. The group of students and tutors also dug the soil for the foundations, then laying out the plastic protection for the soil.

Construction will start on Day 3, so stay tuned for the next steps.

16 The Thin Tile Vaulting Team - Image Credits_Marta Domenech_David Lopez_Mariana Palumbo

This entry was posted in IaaC Life, Uncategorized and tagged , , , , , , , . Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*


6 − = three


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>