PRACTISE FABRICATION // BRICK WORKS THIN-TILE VAULT // day 6 & 7

On the last scheduled day on the site, a big effort was made to finish the first layer of bricks, in order for the pavilion to obtain structural integrity and the steel rods to be removed. The weather slowed things down, as varying humidity conditions affected with the behaviour of the fast-setting concrete mixture, while at times rain made it impossible to work on the site. Students and stuff put a lot of effort, while becoming acquainted with this unique catalan technique. Once more, the day ended with a big barbeque. The pavilion is not yet complete, which means more visits will be paid to the site until the completion of the structure.

SONY DSC

This entry was posted in IaaC Life, Uncategorized and tagged , , , , . Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*


+ one = 7


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>