On the last scheduled day on the site, a big effort was made to finish the first layer of bricks, in order for the pavilion to obtain structural integrity and the steel rods to be removed. The weather slowed things down, as varying humidity conditions affected with the behaviour of the fast-setting concrete mixture, while [...]
IaaC Blog
Inside the Institute
MAA 2014-2015
MAA 02
MAI
Valldaura Labs
Open Thesis Fabrication
Research Trips