Day three of the Brick Works Thin-Tile Vault Seminar – and second day on the site – kicked off with a collective effort to finish the wooden formwork. Once finished, the wooden formwork was carried and installed to the site, a process that required a lot of manual labour. Laser-cut cardboard pieces that will be [...]
IaaC Blog
Inside the Institute
MAA 2014-2015
MAA 02
MAI
Valldaura Labs
Open Thesis Fabrication
Research Trips