This week, the master students are working together with Gregory Epps from RoboFold in the prototyping and fabrication of a folded component façade system.
Starting from the paper model and going through the design and fabrication process developed during the last years by Epps and his colleagues, the workshop will go until the fabrication and assembling of real scale steel components. The students started working individually and their work has been selected in different phases so that, at the end, a single project shared by all students will go into real scale production.